TIBA COORDINATES URGENT REPLACEMENTS FOR DAMAGED WIND FARM EQUIPMENT IN COSTA RICA

Posted on 10 May 2018 at 4:23 by Pawika Naiswasdi

TIBA has just initiated a demanding shipment of renewable energy equipment from Spain to Costa Rica that weighs around 100 tons.

The shipment is from Santander harbor with final destination the Orosi wind farm in Costa Rica, that recently suffered important damages. The cargo is to replace some of the damaged equipment.

For this door to door shipment, the cargo will be loaded on MAFI’s and Ro-Trailers for easy and safe handling.

 

 

 

 

Leave a Reply

17 − 5 =

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

AiO AGM 2016

AiO AGM 2018

View more

 

The AiO Concept

AiO is probably the most cost saving international logistics network out there to join.

Gary Dale Cearley View more